- Cpk = 1.851 (one characteristic on one part, not a blanket capability claim) on a representative length characteristic (76.1–76.5 mm), against an initial-study target of Ppk ≥ 1.67.
- Hexagon CMMs (2), vision machines, gear measuring center, laser microscope, and SURFCOM for dimensional and form verification.
- XRF material checks on every incoming lot against the mill certificate.
- GD&T verification — every callout mapped to a measured value on the inspection report.
Read the tolerance band before you read the index. Cpk is a ratio of the tolerance band to the process spread, not an absolute measure of accuracy. The figure above was recorded on a length characteristic with a 0.4 mm band (76.1–76.5 mm) — wide by design. Hold the same process spread against a ±0.005 mm feature and it fails outright. Ask for the band, the subgroup count and the sampling window on every capability number a supplier quotes.

What does quality mean for a CNC prototype?
Quality is the difference between a part that fits and a part you can prove fits. On a prototype, the proof has three layers: dimensional (the CMM report that maps each callout to a measured value), material (the mill certificate and the XRF check that confirm the alloy), and process (the SPC chart that shows the tolerance was held repeatably, not once by luck). A part with only the first layer is machined; a part with all three is verified.
The three layers matter together because they fail in different ways. A part can be dimensionally perfect and made of the wrong alloy. It can be the right alloy and dimensionally perfect on one piece, while the process behind it cannot repeat. Each layer answers a question the others cannot.
How is GD&T verified on a prototype?
A CMM does not judge "the part looks right" — it measures each callout against its datums. Our Hexagon GLOBAL S CMMs report position, profile, and form as numbers that map back to the feature control frames on your drawing. The inspection report is therefore the bridge between design intent and the physical part: it tells you not just that a hole is within tolerance, but how far it is from true position and relative to which datum.
Which certifications back the quality system?


Three third-party-surveilled certificates, with scope stated honestly rather than stretched.
| Standard | Certificate number | Scope |
|---|---|---|
| ISO 9001:2015 | 116024/A/0001/UK/En | Machining of metal parts |
| IATF 16949:2016 | 131941/A/0001/SM/En | Manufacture of CNC metal machining parts (excludes product design, Clause 8.3) |
| ISO 14001:2015 | 116024/B/0001/UK/En | Environmental management related to machining of metal parts |
Honest scope note: IATF 16949 excludes product design under Clause 8.3. We are a build-to-print manufacturer — if your program needs us to own design responsibility, say so up front and we will scope it accordingly rather than over-promise.
How does SPC prove process control?

A capability statement is cheap; a control chart is evidence. Our SPC runs control charts on key characteristics, with a standard of Ppk ≥ 1.67 initial on critical and Cpk ≥ 1.33 on general characteristics. On a representative length characteristic (76.1–76.5 mm), the chart shows Cpk = 1.851 (one characteristic on one part, not a blanket capability claim) — the process sits comfortably inside the tolerance band, not just scraping by.
| SPC metric | Value | Standard |
|---|---|---|
| Characteristic | Length, 76.1–76.5 mm | Key characteristic |
| Cpk (measured) | 1.851 (one characteristic on one part, not a blanket capability claim) | ≥ 1.67 (key) |
| Cp (measured) | 3.46 | — |
The Cpk number is only meaningful next to its target. A key characteristic needs Ppk ≥ 1.67 initial, which means the process mean sits far enough from the tolerance limit that a real drift will still not push parts out of spec. A general characteristic can accept Cpk ≥ 1.33. Our measured Cpk of 1.851 (one characteristic on one part, not a blanket capability claim) on a representative length characteristic sits comfortably above the key target — the process is not scraping the edge of the tolerance band.
Two numbers appear on the SPC chart — Cpk and Cp. Cp describes how wide the process is relative to the tolerance band, ignoring where it is centered; Cpk describes both the width and the centering. A process can have a high Cp and a low Cpk if it is precisely machining in the wrong place. Our chart shows Cp = 3.46 alongside Ppk ≥ 1.67 at the initial study on key characteristics, which means the process is both narrow and centered on the target, not just consistently off to one side.
What inspection equipment verifies GD&T callouts?
The inspection bench is the same class of equipment a buyer would use to audit us, and we document the results, not just the pass/fail.
- Hexagon GLOBAL S CMMs (2) for position, profile, and form verification, plus a gear measuring center (ZD20) and vision measuring machines.
- KEYENCE VK-X3000 laser microscope and SURFCOM 1800D for surface finish and profile.
- HVS-1000A micro-Vickers hardness tester, Fischer coating thickness gauge, salt spray and tensile testers.
The instruments divide the work. The CMM handles geometry — position, profile, form. The profilometer handles surface finish. The vision machine and laser microscope handle small features and surface detail the CMM probe cannot reach. The gear measuring center handles tooth geometry. The hardness tester confirms heat treatment. Together they cover the ways a part can be wrong, not just the ways a CMM can see.
How is incoming material verified before machining?


Quality starts at the door. Every incoming lot is checked by XRF against its mill certificate before it touches a machine, so mixed or substituted alloys are caught at the dock rather than discovered in the field. The iCHEQ handheld spectrometer reads the composition and we compare it to the certificate the mill supplied — the material you specified is the material you receive.
The check is against the mill certificate, not against a guess. The certificate says what the mill claims the heat was; the XRF reads what the alloy actually is. The two have to agree, and when they do not, the lot is quarantined. The paper trail is what makes the material claim something you can audit rather than something you have to take on faith.
How does tolerance stackup get caught in inspection?

Tolerance stackup is where assemblies fail even when every part is "in spec" individually. By measuring features to a common datum rather than chaining them part-to-part, a CMM report shows where the tolerance budget is being spent. That is the real payoff of prototyping: the stackup problem shows up on the inspection report now, at prototype cost, instead of on the production line, at tooling cost.
How does APQP/PPAP discipline apply to fit-critical programs?
For fit-critical and regulated programs, quality planning is a deliverable, not an afterthought. We run APQP/PPAP on customer projects, producing the documents auditors expect: process flow chart, control plan with special characteristics and inspection frequency, PFMEA with severity/occurrence/detection ratings and RPN, and SPC control charts. This is the same structure IATF 16949 audits verify, and it runs on every job, not just automotive ones.
APQP runs in five phases: plan and define, product design and development, process design and development, product and process validation, and feedback with corrective action. For a build-to-print factory, the middle phases are where the control plan, the PFMEA, and the SPC chart are built, and the validation phase is where the prototype's measurement data proves the process can hold the callouts.
PPAP is the package that documents that proof: the process flow chart, the control plan with special characteristics, the PFMEA with severity/occurrence/detection ratings, the SPC charts, and the dimensional results. For a fit-critical program, the prototype's CMM report is not a separate document from PPAP — it is the dimensional evidence that feeds it. The prototype is where the control plan earns its first real data.
How does SPC tell the difference between a good day and a capable process?
A good day is one part that measures well. A capable process is many parts that measure well, with the mean and the spread stable enough that the next part is predictable. SPC makes that distinction by tracking the process over time on a control chart: the mean, the spread, and whether either drifts. One good part proves nothing about the next part; a stable chart does.
Why does material composition matter to a tolerance?
The alloy determines how the part cuts, how it distorts under clamping and machining, and how it measures after release. Two alloys with similar names can machine to the same numbers in the fixture and then diverge in service — different strength, different hardness, different corrosion behavior. For a prototype whose job is to validate a design, a substituted alloy invalidates every conclusion the prototype was meant to produce.
What does a first-article inspection actually check?
A first-article inspection (FAI) verifies every characteristic on the drawing against the first piece off the process, not a sample, the first article. Each dimension, each note, and each GD&T callout is measured and recorded, and the result is compared to the drawing's requirement. The FAI is the document that says the process, as set up, produces the part the drawing describes.
For a prototype, the FAI and the CMM report are effectively the same deliverable. Both answer the same question — does this part, measured, match what the drawing demands. When the prototype passes its FAI, the process that produced it is ready to be documented and carried into production.
How does the quality system catch a wrong material or a mixed lot?
It starts at the door. Every incoming lot is XRF-checked against its mill certificate before it reaches a machine, and the result is recorded against the lot number. If the composition does not match the certificate, the lot is quarantined and the supplier is questioned. The MES/ERP link then carries that lot number through to the finished part, so a mixed lot cannot quietly enter the build.
The quarantine is the important part. A check that only flags the problem but still lets the material through is a check that does nothing. The rule is that a mismatched lot does not touch a machine until it is resolved, because a prototype made from the wrong stock teaches you nothing about your design.
What is the difference between a CMM report and a certificate of conformance?
A certificate of conformance is a promise that the part meets the print; it can be issued without a single measurement. A CMM report is a table of measurements that maps each callout to a value. One is assurance, the other is evidence. For a prototype, evidence is the point — the whole reason to make the part is to learn the numbers, so a document without numbers is a document without a purpose.
How does APQP planning change a prototype's documentation?
APQP turns the prototype from a one-off into the first step of a controlled process. Before cutting, the control plan names the special characteristics and how often each is checked; the PFMEA names the ways the process could fail and how they are prevented; the SPC chart tracks the key characteristics. The prototype's data then lands inside that structure, ready to become the production record.
What should a buyer ask about a prototype's quality record?
Ask for the CMM report with measured values, not a pass/fail summary. Ask for the material certificate and the XRF result. Ask whether the SPC chart is available for the key characteristics. Ask whether the records are stored in a system that will carry into production, or only in a folder on someone's desk. The answers tell you whether the quality system is real or decorative.
- CMM report with values: not a pass/fail stamp.
- Material certificate + XRF: the alloy, with paper.
- SPC chart: the process, tracked over time.
- Record system: does the prototype's history carry into production.
How does a gage R&R study protect the measurement?
A gage repeatability and reproducibility (GR&R) study measures how much of the variation in a measurement comes from the gage and the operators, rather than from the part. If the measurement system itself is noisy, then a part can measure in or out of tolerance depending on who holds the probe and when. The GR&R study is what makes the CMM report trustworthy before a single production part is judged by it.
For a prototype, this matters because the report is the entire deliverable. A measurement system that adds its own variation would mask a real deviation or invent one that is not there. Verifying the measurement system first is the same discipline as XRF-checking the material first — it confirms the tool before trusting its answer.
What happens when a callout fails inspection on a prototype?
A failed callout is information, not a disaster, that is what a prototype is for. The CMM report tells us which feature is out, by how much, and against which datum. The failure then gets sorted into two kinds: a process failure (the machine or setup did not hold the tolerance) or a design failure (the tolerance itself is unattainable or unnecessary). The fix for the first is a process correction; the fix for the second is a drawing change.
The value of catching this on a prototype is the cost of the alternative. The same failure on a production lot, after tooling is committed, is a rework or a recall. On a single prototype, it is an email and a revised drawing. That is the entire economic argument for prototyping before tooling, and the quality record is what turns the failure into a decision instead of a surprise.
What this shop actually runs
If you ask for capability evidence, you deserve a specific answer. This facility operates 100+ CNC machines across 6,800 m2 in Dongguan, China, staffed by 100+ people. The machines, listed by category:
- 5-axis machining centres (10+) - Mazak VARIAXIS I-600 (510/910/510 mm travel, 12,000 rpm, 22 kW, 71.6 N·m, 30-tool BT40) and Mazak INTEGREX I-250H S (B-axis 0.0001°, 24 kW, 124 N·m, 38-tool HSK-A63). Practical for compound-angle parts, single-setup multi-face prismatic work, and aerospace fittings where datum transfer loss is unacceptable.
- 3-axis / 4-axis machining centres (50+) - Brother SPEEDIO S500Z2N / S700Z2N (10,000 rpm, 14/21-tool ATC, 0.7 s tool-to-tool, Z-axis 2.2 G) and Mazak VCE-430A L / VCE-570C L (10,000 rpm, 118 N·m, 24-tool ATC). Practical for prismatic parts, plates, brackets, housings.
- Swiss-type turning centres (10+) - Citizen Cincom A20-3F7 (Φ20 mm, 10,000 rpm), TSUGAMI B0206-III / B0205-III (Φ20 mm, 0.1 µm), STAR SR-32JII / SR-32J Type N (Φ32 mm, 8,000 rpm). Practical for long, slender rotational parts at ±0.002 mm.
- CNC turning centres (20+) - HEADMAN T70M/1250 (720 mm swing, 117 mm bore, 3,000 rpm, BMT75 12-station turret). Practical for shafts, bushings, flanges up to ±0.002 mm.
- Wire EDM (5+) - Sodick AQ535L (550/350/300 mm travel, ±20° taper, 800 kg workpiece). Practical for hardened tool steel, internal splines, sharp internal corners that milling cannot reach.
- Inspection: Hexagon CMM + 20+ gauges - Hexagon CMM for coordinate measurement, plus vision system, profilometer, hardness tester, coating thickness gauge, XRF for material verification. The 10:1 rule (gauge 10x more accurate than the band) is applied to every feature.
- Machine highlights - VARIAXIS I-600: one-setup multi-face 5-axis + MAZA-CHECK auto-calibration; INTEGREX I-250H S: DONE-IN-ONE mill-turn, B-axis 0.0001° + Ai thermal shield; SPEEDIO S500Z2N / S700Z2N: Z-axis 2.2 G + 0.7 s ATC; Swiss-type: guide-bush switchable + 0.1 µm resolution.
Tolerance bands: ±0.003 mm milled, ±0.002 mm turned, ±0.002 mm ground or wire-cut. Capability indices: Ppk >= 1.67 at the initial study; Cpk >= 1.33 ongoing in production.
Certifications: ISO 9001:2015 (116024/A/0001/UK/En) · IATF 16949:2016 (131941/A/0001/SM/En, design clause 8.3 excluded) · ISO 14001:2015 (116024/B/0001/UK/En), held by Dongguan Zhuohang Ltd (USCC 91441900MA4UWT6X39, since 2005).
Service area: we supply Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa, with worldwide delivery from China.
Contact: Felipe Iglesias, [email protected], +86 13126536955.
Ready to machine a prototype to your GD&T callouts?
Send your drawing to [email protected] or call +86 13126536955 for a DFM review and quote.
Frequently Asked Questions
What does quality mean for a CNC prototype?
It means the prototype is measured against its GD&T callouts, not just machined. Datums, feature control frames, position, profile, and form tolerances are verified on a Hexagon CMM and the results are documented, not assumed.
How is GD&T verified on a prototype?
A Hexagon CMM measures each callout against its datums and reports position, profile, and form as numbers that map back to the feature control frames on the drawing, so you receive evidence rather than an assurance.
Which certifications back the quality system?
ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En), and ISO 14001:2015 (116024/B/0001/UK/En). The IATF 16949 scope excludes product design under Clause 8.3, so the factory is build-to-print.
What SPC evidence is available?
In short, On a representative length characteristic (76.1–76.5 mm) the control chart shows Cpk = 1.851 (one characteristic on one part, not a blanket capability claim), exceeding the key-characteristic target of Ppk ≥ 1.67 initial. The standard is Ppk ≥ 1.67 initial for key characteristics and Cpk ≥ 1.33 for general characteristics.
How is incoming material verified?
Every incoming lot is checked by XRF against its mill certificate before it touches a machine, so mixed or substituted alloys are caught at the door and the alloy you specified is the alloy you receive, with the paper to prove it.
How is a tolerance stackup caught?
By measuring features to a common datum rather than chaining part-to-part, a CMM report shows where the tolerance budget is being spent, so a stackup that would fail the assembly is caught at the prototype stage, before tooling is committed.
Which certifications do you hold?
ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En), and ISO 14001:2015 (116024/B/0001/UK/En). The IATF 16949 scope excludes product design under Clause 8.3, so the factory is build-to-print.
What SPC evidence can you show?
In short, On a representative length characteristic (76.1–76.5 mm) the control chart shows Cpk = 1.851 (one characteristic on one part, not a blanket capability claim), exceeding the key-characteristic target of Ppk ≥ 1.67 initial. The standard is Ppk ≥ 1.67 initial for key characteristics and Cpk ≥ 1.33 for general characteristics.
Continue reading: CNC Prototyping Factory · CNC Prototyping Services · Contact CNC Prototyping
Standards referenced on this page
- ASTM A582/A582M-12 — Standard Specification for Free-Machining Stainless Steel Bars
- ISO 14001 — Environmental management systems — Requirements with guidance for use
- IATF 16949:2016 — Automotive quality management system standard