- 6,800 m² facility in Hengli Town, Dongguan, Guangdong, China 523470.
- 100+ production machines — milling (3/4/5-axis), turning, mill-turn, grinding; 20+ inspection instruments.
- Hexagon CMMs for GD&T verification — position, profile, and form mapped to measured values.
- 100+ employees, 80%+ skilled technicians, 60% with 5–10 years of service.

What should you verify in a CNC prototyping factory?
A factory is defined by what it can show, not what its website claims. Before you place an order, verify five things: the machine list with models and counts, the CMM inspection equipment, the certificate numbers, the traceability record, and whether secondary operations are owned or outsourced. A real manufacturer can produce all five on request; a trading desk cannot.
- Machine list: names models and counts, not just "CNC machines."
- Inspection: CMMs that report GD&T callouts to measured values, not capability statements.
- Certificates: numbers are verifiable with the registrar.
- Traceability: a sample lot record linking material, machine, operator, and inspection.
- Secondary ops: owned in-house or outsourced to a named partner.
| Ask for… | A strong answer | A weak answer |
|---|---|---|
| Machine list | Models and counts, matched to the floor | "We have many CNC machines" |
| CMM evidence | A report mapping callouts to values | "We are very precise" |
| Certificate numbers | Verifiable codes | "Fully certified" |
| Traceability record | A sample lot record | "We track everything" |
| Secondary operations | Named, owned or partners | "We handle everything" |
How large is the facility and what runs there?
The facility spans 6,800 m² in Hengli Town, Dongguan, staffed by 100+ employees — 80%+ skilled technicians, 60% with 5–10 years of service, and 70% aged 20–35. The campus holds a production building (machining, inspection, offices) plus a staff dormitory and canteen. The company was founded in 2005, and the founder carries 28 years of industry experience.
| Metric | Value |
|---|---|
| Facility area | 6,800 m² |
| Employees | 100+ |
| Production machines | 100+ |
| Inspection instruments | 20+ |
| Founded | 2005 |
The numbers on the facility page mean something concrete for a prototype. 6,800 m² is enough space to run milling, turning, mill-turn, and grinding without one process crowding another. 100+ production machines mean a prototype does not wait behind a production run for machine time. 100+ people mean the person who sets up your part and the person who measures it are not the same exhausted individual. A factory that runs a prototype with the same discipline as production is the point — the prototype should be a small production part, not a lab experiment.
Which machines hold the GD&T tolerances?

The machine list is the single most honest signal of what a factory can actually do, and of whether it can hold the positional and profile tolerances a GD&T drawing demands. Ours spans the full metal-cutting range, with representative families from Brother and Mazak.
| Role | Representative models | Key specs |
|---|---|---|
| High-speed vertical machining | Brother SPEEDIO S500Z2N / S700Z2N | BT30, 0.7 s tool change, up to 27,000 rpm |
| Heavy / medium vertical machining | Mazak VCE-430AL / VCE-570CL | BT40, 900×430 / 1300×570 mm tables |
| Turret mill-turn | Brother M300X3 RD / M200X3 RD / M200X3 | X/Y/Z/A/C five-axis, single-setup turn-mill |
| Twin-spindle mill-turn | Mazak QT-COMPACT 200MSY L | 8" main + 6" sub spindle, Y-axis ±50 mm |
| 5-axis mill-turn | Mazak INTEGREX i-H series | B-axis 0.0001° resolution |
| Vertical 5-axis machining | Mazak VARIAXIS i series | Ø500–800 mm rotary tables |
| Swiss-type (sliding headstock) | Citizen Cincom A20 / Star SR-32JII / Tsugami B0205 | Ø20–32 mm bar, back-spindle live tooling |
Max workpiece: 1300 × 700 × 600 mm for milling and Ø720 × 1280 mm for turning. If your part exceeds these, we say so up front rather than routing it somewhere unvetted.
A machine's spec sheet is only the starting point. What holds a tolerance is the combination of the machine, its condition, and the person running it. A new machine in bad hands and a worn machine in good hands will both drift. This is why the factory's maintenance schedule and its people matter as much as the brand name, and why we are specific about models rather than hiding behind a generic equipment claim.
| Tolerance callout | Machine class that holds it |
|---|---|
| Position / profile on prismatic parts | Vertical machining center (Brother / Mazak) |
| Runout / concentricity on shafts | Swiss-type or twin-spindle lathe (Citizen / Star / Tsugami) |
| Mixed features in one setup | Mill-turn or 5-axis (Mazak INTEGREX / VARIAXIS) |
| Bearing-grade size and roundness | Precision grinder |
How does the factory verify GD&T callouts?
The machines hold the tolerances; the inspection room proves they did. Hexagon GLOBAL S CMMs measure position, profile, and form against the datums on your drawing, and the report maps each feature control frame to a measured value. Vision measuring machines, a gear measuring center (ZD20), a KEYENCE laser microscope, and a SURFCOM profile instrument support surface and form verification on top of the dimensional checks.
The CMM program is written from the drawing, not from memory. For each feature control frame, the program builds a measurement routine against the datums the drawing names, probes the feature, and reports the deviation. The same program runs on every part of that drawing, which is what makes the report comparable from prototype to production lot.
Before a CMM result is trusted, the measurement system itself is checked. The machine is verified against a calibrated standard, and the inspection process is subject to a gage repeatability and reproducibility (GR&R) study, so we know the variation in the number is from the part, not from the measuring. A tolerance band is only as meaningful as the measurement system behind it.
How does MES/ERP support prototype traceability?
A prototype is often the first part of a program that will later run to a controlled plan, so traceability should be in place from the first piece, not bolted on at production. Our MES/ERP system records raw-material source, process parameters, machine data, production batch, machining time, operator identity, and inspection results on every lot. When a prototype becomes a production part, the record is already there.
| Record field | Why it exists |
|---|---|
| Raw material batch | Links the part to a mill certificate and XRF check |
| Machine and operator | Locates the part in time and in the process |
| Process parameters | Shows the speeds, feeds, and offsets used |
| Inspection results | Maps each callout to a measured value |
The system also removes the temptation of prototype special treatment. A part logged through MES/ERP is measured by the same rules as a production part, not waved through because it is "just a prototype". The whole point of the prototype is the evidence it produces, so skipping the measurement to save time would defeat its purpose.
How is the facility certified?
Three third-party-surveilled certificates, with scope stated honestly.
| Standard | Certificate number | Scope |
|---|---|---|
| ISO 9001:2015 | 116024/A/0001/UK/En | Machining of metal parts |
| IATF 16949:2016 | 131941/A/0001/SM/En | Manufacture of CNC metal machining parts (excludes product design, Clause 8.3) |
| ISO 14001:2015 | 116024/B/0001/UK/En | Environmental management related to machining of metal parts |
Company registration number: 91441900MA4UWT6X39. The three certificates cover quality management, the automotive-grade quality system, and environmental management, each with a scope stated plainly. A build-to-print scope is a feature, not a limitation — it means the factory owns the machining and the verification, while design responsibility stays where the drawing lives.
Where is the factory located?
The factory sits at No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470 — inside the Pearl River Delta manufacturing corridor. That location puts it close to Shenzhen and Hong Kong ports, which shortens export transit to North America, Europe, and Japan, and to the raw-material and surface-treatment suppliers the factory uses.
The location matters in three practical ways. Raw material is sourced nearby and fast, so a prototype is not waiting on a cross-country shipment of bar stock. Surface treatment and heat treatment partners are local, so a part that needs plating or stress relief does not add days of transit. And the ports shorten the export leg, which is part of why a simple prototype ships in the shortest tier rather than the number being a marketing promise.
Can I visit or audit the factory?
Yes. Visits and audits are welcome, in person or by video. Walk the shop floor, the inspection room, and the traceability records before you commit — a factory that invites this is a factory that has nothing to hide. Send your requirements to [email protected] to schedule.
How does machine maintenance protect a tolerance?
A machine that is not maintained drifts. Spindle runout, backlash in the axes, and thermal expansion all move the tool away from where the program thinks it is, and every one of those errors lands inside your tolerance band. Maintenance — scheduled calibration, spindle checks, ball-screw inspection — is what keeps the machine's actual position close to its commanded position. A factory with a maintenance schedule can show it; one without it is borrowing the tolerance from luck.
The same logic applies to the CMM. A measuring machine that is not verified against a calibrated standard will report numbers with confidence and no accuracy. The whole verification chain — machine, CMM, standard — has to be maintained together, or the report becomes a document of a shared delusion rather than a record of the truth.
What does the inspection room need beyond a CMM?
A CMM measures geometry; it does not measure everything. Surface finish needs a profilometer, small features need a vision machine or laser microscope, gears need a gear measuring center, hardness needs a hardness tester, and coating thickness needs a gauge. A room equipped with only a CMM will pass a part whose surface is wrong or whose coating is thin, because the CMM never looked at either. The supporting instruments are what make the report complete rather than partial.
How does the factory keep a prototype's record when it becomes production?
The record that starts on a prototype continues onto the production lot because it lives in the same MES/ERP system. The material batch, the machine, the parameters, and the inspection results are stored against the part number, not against the word "prototype". When the drawing is revised and the part goes to volume, the history is already there, which is exactly what a PPAP or an auditor will ask to see.
How do you verify a certificate number yourself?
Take the certificate number and the issuing registrar's name, and check the number against the registrar's public records. The number should resolve to the company, to the standard, and to a scope that covers the process you are buying. If the number cannot be checked, or the scope omits your process, treat it as unverified. The certificate table on this page gives the numbers so you can do exactly that before you commit.
What should an audit walkthrough cover?
Three stops, in order. First, the shop floor: do the machines match the list, and are parts fixtured the way the drawings assume. Second, the inspection room: ask to see a live CMM run and a report in progress, not a sample prepared earlier. Third, the records: ask for a sample lot record from a recent prototype and follow it from raw material to inspection. A factory that can show all three on short notice has nothing to hide.
The point of the walkthrough is not to catch a factory in a lie; it is to confirm that the claims on the page are backed by equipment and records on the floor. Most of the time, the walkthrough confirms the story. When it does not, the mismatch is exactly what you came to find.
How does people stability protect your tolerance?
The tolerance is held by people, not by machines alone. When 80%+ of the team are skilled technicians and 60% have been here five to ten years, the process knowledge — how a fixture behaves, how a machine drifts, how a material cuts — stays on the floor instead of walking out the door. That stability is what makes a ±0.003 mm (milling) / ±0.002 mm (turning) band repeatable across months, and what makes the founder's 28 years of experience useful to a buyer rather than a line on a brochure.
How does the factory handle a part that exceeds its machine envelope?
Every factory has a work envelope — the largest part its machines can hold. Ours is 1300 × 700 × 600 mm for milling and Ø720 × 1280 mm for turning. When a part exceeds that, the honest answer is to say so up front and discuss options, not to route it to an unvetted shop and hide the hand-off. A prototype that is too big for the envelope is a planning problem to solve before quoting, not a surprise to discover after the order.
The same discipline applies in the other direction: a part that is too small or too delicate for a given machine belongs on the right machine, not the convenient one. Envelope honesty runs both ways, and it is part of matching the process to the callout.
What makes a prototype factory different from a production-only shop?
A prototype factory differs from a production-only shop in one respect that matters for GD&T: it is set up to run one piece well, not a thousand pieces identically. The setup, the CMM program, and the report are built for a single part, then carried forward when the part goes to volume. A production-only shop may treat the prototype as a nuisance order and skip the very documentation that the prototype exists to produce.
The MOQ of 1 piece is not a discount — it is a different mode of working. It means the factory's setup, inspection, and record-keeping are organized so that a single part carries the same evidence as a production lot. That is the whole point of a prototype, and it is what this factory is built around.
What this shop actually runs
If you ask for capability evidence, you deserve a specific answer. This facility operates 100+ CNC machines across 6,800 m2 in Dongguan, China, staffed by 100+ people. The machines, listed by category:
- 5-axis machining centres (10+) - Mazak VARIAXIS I-600 (510/910/510 mm travel, 12,000 rpm, 22 kW, 71.6 N·m, 30-tool BT40) and Mazak INTEGREX I-250H S (B-axis 0.0001°, 24 kW, 124 N·m, 38-tool HSK-A63). Practical for compound-angle parts, single-setup multi-face prismatic work, and aerospace fittings where datum transfer loss is unacceptable.
- 3-axis / 4-axis machining centres (50+) - Brother SPEEDIO S500Z2N / S700Z2N (10,000 rpm, 14/21-tool ATC, 0.7 s tool-to-tool, Z-axis 2.2 G) and Mazak VCE-430A L / VCE-570C L (10,000 rpm, 118 N·m, 24-tool ATC). Practical for prismatic parts, plates, brackets, housings.
- Swiss-type turning centres (10+) - Citizen Cincom A20-3F7 (Φ20 mm, 10,000 rpm), TSUGAMI B0206-III / B0205-III (Φ20 mm, 0.1 µm), STAR SR-32JII / SR-32J Type N (Φ32 mm, 8,000 rpm). Practical for long, slender rotational parts at ±0.002 mm.
- CNC turning centres (20+) - HEADMAN T70M/1250 (720 mm swing, 117 mm bore, 3,000 rpm, BMT75 12-station turret). Practical for shafts, bushings, flanges up to ±0.002 mm.
- Wire EDM (5+) - Sodick AQ535L (550/350/300 mm travel, ±20° taper, 800 kg workpiece). Practical for hardened tool steel, internal splines, sharp internal corners that milling cannot reach.
- Inspection: Hexagon CMM + 20+ gauges - Hexagon CMM for coordinate measurement, plus vision system, profilometer, hardness tester, coating thickness gauge, XRF for material verification. The 10:1 rule (gauge 10x more accurate than the band) is applied to every feature.
- Machine highlights - VARIAXIS I-600: one-setup multi-face 5-axis + MAZA-CHECK auto-calibration; INTEGREX I-250H S: DONE-IN-ONE mill-turn, B-axis 0.0001° + Ai thermal shield; SPEEDIO S500Z2N / S700Z2N: Z-axis 2.2 G + 0.7 s ATC; Swiss-type: guide-bush switchable + 0.1 µm resolution.
Tolerance bands: ±0.003 mm milled, ±0.002 mm turned, ±0.002 mm ground or wire-cut. Capability indices: Ppk >= 1.67 at the initial study; Cpk >= 1.33 ongoing in production.
Certifications: ISO 9001:2015 (116024/A/0001/UK/En) · IATF 16949:2016 (131941/A/0001/SM/En, design clause 8.3 excluded) · ISO 14001:2015 (116024/B/0001/UK/En), held by Dongguan Zhuohang Ltd (USCC 91441900MA4UWT6X39, since 2005).
Service area: we supply Austria, Belgium, the Czech Republic, Denmark, France, Germany, Greece, Hungary, Ireland, Italy, the Netherlands, Spain, Sweden and the United Kingdom in Europe; Brazil, Canada, Mexico and the United States in the Americas; China, Israel, Japan, Singapore and Sri Lanka in Asia; Australia and New Zealand in Oceania; and South Africa in Africa, with worldwide delivery from China.
Contact: Felipe Iglesias, [email protected], +86 13126536955.
Ready to machine a prototype to your GD&T callouts?
Send your drawing to [email protected] or call +86 13126536955 for a DFM review and quote.
Frequently Asked Questions
What should you verify in a CNC prototyping factory?
Verify the machine list with models and counts, the CMM inspection equipment, the certificate numbers, the traceability record, and whether secondary operations are owned or outsourced. A real factory can show all five; a trading desk cannot.
How large is the facility?
The facility is 6,800 m² in Hengli Town, Dongguan, with 100+ employees and 100+ production machines across milling, turning, mill-turn, and grinding, founded in 2005. The campus holds a production building plus a staff dormitory and canteen.
How does the factory verify GD&T callouts?
Hexagon CMMs measure position, profile, and form against datums, and the report maps each feature control frame to a measured value. Vision machines, a gear measuring center, and a laser microscope support surface and form inspection.
Is the factory certified?
Yes — ISO 9001:2015 (116024/A/0001/UK/En), IATF 16949:2016 (131941/A/0001/SM/En), and ISO 14001:2015 (116024/B/0001/UK/En). The IATF 16949 scope excludes product design under Clause 8.3.
Where is the factory located?
No. 8, Shuibian Songyuan Road, Hengli Town, Dongguan, Guangdong, China 523470 — inside the Pearl River Delta manufacturing corridor, close to Shenzhen and Hong Kong ports for export shipping.
Can I visit or audit the factory?
Yes. Factory visits and audits are welcome, whether in person or by video. Send your requirements to [email protected] to schedule a walkthrough of the shop floor, inspection bench, and traceability records before you commit.
Continue reading: CNC Prototyping Services · Contact CNC Prototyping · CNC Prototyping
Standards referenced on this page
- ASTM A582/A582M-12 — Standard Specification for Free-Machining Stainless Steel Bars
- ISO 14001 — Environmental management systems — Requirements with guidance for use
- IATF 16949:2016 — Automotive quality management system standard
Business conduct and due diligence
We operate in full compliance with all applicable laws and regulations. Suppliers are paid on agreed terms and wages are paid in full and on time. Every full-time employee receives the statutory benefits required by law. We support local community development through charitable donations.
Our legal and regulatory record is publicly verifiable in China, with no material litigation or enforcement action involving customers, suppliers, employees, authorities, or other third parties. Buyer-side due diligence is welcome.
